- Sun - Thu 7AM - 4PM
- 260817 Riyadh - KSA
The development works of the industrial city (Al-Fanar City)
include asphalt works with an area of 280,000 square meters,
the supply and installation of a rainwater drainage network of GRP pipes with a length of 7,600 meters, and the supply and installation of a drainage line. 3000 m long. The work of installing an iron network wall, making an iron tank and a wall for the main station of the PRECAST type
nfrastructure works for Tatweer Industrial City
August 1, 2021
MODON